top of page
St_edited.jpg

St. Andrews

St. Andrews Rain Gardens

Watershed: South River

Status: Completed 2015

St. Andrews Methodist Day School’s rain garden was installed in 2015. It feeds into Church Creek, off the South River. Church Creek has historically been the most impaired creek on the South River due to the high percentage of impervious surfaces (hard surfaces such as parking lots and roofs that do not absorb water). The Contractor was Severn Grove Ecological Design.

Before

Screenshot 2024-08-01 123543.png
Screenshot 2024-08-01 123502.png

After

St. Andrews BMP After Construction (2).JPG
Screenshot 2024-08-01 123514.png
Screenshot 2024-08-01 123559.png
St. Andrews BMP After Construction (4).JPG
bottom of page